Ground Screw Foundations for Construction Site Hoardings

A quick, solid foundation for site hoardings, so a site can be secured against intruders straight away rather than days later.

Site secured on day one

  • Development, supply and installation under one roof
  • One of the UK's biggest independent ground screw distributors
  • Screws made from 70% recycled galvanised steel
  • Around 70% faster and cheaper than digging
  • No excavation, no concrete, no spoil to remove

What site hoardings involves

Hoarding lines are the first thing on a site and the last thing off it. Ground screws give the posts a driven foundation that takes load immediately, so panels can be fixed the same day.

Screws are specified for the hoarding height and the exposure of the line, with the type matched to the ground along the run.

Who it is for

Principal contractors, hoarding installers and site setup teams who need a secure perimeter before anything else can begin.

It suits urban plots with hard surfaces and buried services, where a continuous concrete foundation is slow, expensive or simply not permitted.

When it is needed, and why specialist installation matters

Hoarding foundations are needed at the very front of the programme, because nothing else on a site can safely start until the perimeter is closed.

Screws are the practical answer on urban plots with hard surfaces and buried services, on short-term sites, and anywhere a continuous concrete foundation is too slow, too expensive or simply not permitted.

The specification has to be right because a tall hoarding run is one long sail. Panel height, any signage fixed to it and the exposure of the line all feed into screw selection and spacing.

What happens if it is left

The cost of leaving it another winter

An unsecured site is a liability: theft, trespass and an insurance problem that starts the moment plant arrives.

Concrete hoarding foundations delay that perimeter by days, and then have to be broken out and carted away at the end of the job.

Screws close the site quickly and come out cleanly when the hoarding does.

Common mistakes we are called in to undo

  • Assuming concrete is the only option, and paying for excavation, spoil removal and curing time you do not need.
  • Setting posts in concrete on ground with services below, where a screw could have been positioned and driven safely instead.
  • Buying screws without checking the soil conditions or the load, so the wrong length and diameter go in.
  • Starting a build on foundations that were never set properly to level, and packing the structure to compensate later.

Our process

How a site hoardings job runs, from first call to handover

  1. Step 1

    Request a call back

    You send the form or call us. We ask what you are building, where it is going and what the access is like, so nobody wastes a visit.

  2. Step 2

    Estimate over the phone

    We give you an estimate there and then based on the structure, the loads and the number of screws the job needs. No obligation to go further.

  3. Step 3

    Site visit and assessment

    If you are happy with the estimate, we visit and assess the full requirements: ground conditions, levels, services below ground and the screw specification.

  4. Step 4

    Installation

    Our qualified installers drive the screws in with practical handheld equipment, to the surveyed positions and levels, with total precision and no excavation.

  5. Step 5

    Hand over, ready to build

    Screws are set to level, the ground is left as we found it, and you can start building the same day. No curing time, no spoil, no skip.

What you get

The results this work is actually bought for

No digging and no concrete

The foundation is driven into undisturbed ground. Nothing is excavated, nothing is poured, and there is no spoil to get rid of.

Usually finished in a few hours

Most installations are completed in a single visit, so the build on top can start straight away instead of waiting on a cure.

Works in any weather, any soil

Ground screws are designed for year-round installation and suit all soil types, even on hillsides, so winter does not stop the job.

Cheaper overall

Around 70% faster and cheaper to assemble than normal ground digging, with no skip hire, no muck away and far less labour on site.

Reusable and removable

Made from 70% recycled galvanised steel. The soil stays unsealed, so the foundation can be unwound and reused elsewhere later.

In detail

Site hoardings: materials, methods and where it applies

Wind loading on tall hoardings

A 2.4m hoarding line carries serious wind load. Screw specification and spacing come from the panel height, any signage fixed to it and how exposed the line is.

Where the run crosses different ground, the screw type changes with it.

Programme and removal

Installation is measured in hours per run rather than days, which pulls the whole site setup programme forward.

At handover the screws unwind, leaving no concrete in the ground to dispose of.

Read more

Hoarding runs, heights and ground types

A standard 2.4m plywood hoarding carries substantial wind load, and adding printed signage or mesh to it increases that again. Screw length, diameter and spacing are set from those figures rather than a default centre.

Runs that cross made ground, old foundations, verges and hard surfaces need more than one screw type, so we assess along the line and change the specification where the ground changes.

Returns, gate bays and vehicle entrances see concentrated loads and are specified separately from the plain run.

Programme, security and handover

Screws take load the moment they are driven, so panels follow immediately behind the installation crew and most runs are a single-visit job: measured in hours rather than days.

That pulls the whole site setup forward: a perimeter closed on day one is theft, trespass and insurance exposure closed on day one.

At handover the screws unwind, leaving no concrete in the ground and nothing to dispose of, which matters on plots being returned to a landowner or handed to a following contractor.

Temporary compounds and long-term sites

On short programmes and temporary compounds the removability decides the economics: the screws come out at handover, the ground is left unsealed, and the same screws go back in on the next site instead of being written off.

On long-duration sites the galvanised steel gives the corrosion protection the run needs for the full build, with individual positions replaceable if a vehicle strike damages a post.

Because installation creates no spoil and needs no plant, hoarding can be installed on footways, car parks and surfaced yards without breaking out and reinstating the surface afterwards.

Not sure this is the right specification for your wall? See all of our services, the areas we cover, or go back to the homepage.

FAQs

Site hoardings questions we are asked most

How fast can a hoarding line go in?

Screws are loaded as soon as they are driven, so panels follow immediately behind installation. Most runs are a single-visit job.

Can screws be used on hard surfaces?

Often yes, depending on the make-up beneath. We confirm that during the site assessment.

How long does the installation take?

Most jobs are completed in a few hours, in a single visit. Larger commercial installations are programmed around your site, but there is never any curing time to wait on.

Is there any mess?

Very little. There is no excavation, no concrete and no spoil, so no skip is needed and the surrounding ground is left largely as we found it.

Will ground screws work in my soil?

Ground screws suit all soil types, even on hillsides, and different screws suit different conditions. We confirm the specification when we assess the site.

Can the foundations be removed later?

Yes. The soil is never sealed, so screws can be unwound and reused. That is one of the reasons they suit temporary and relocatable structures so well.

How much will it cost?

Cost depends on the number of screws, their specification and the access on site, so we price each job rather than publishing a rate. Send the details or call us and you will get an estimate over the phone before anybody visits.

How long will the foundation last?

The screws are galvanised steel made from 70% recycled material, so the shaft in the ground is corrosion-protected for the life of the structure above it, and unlike a concrete base it can be unwound, moved and reused rather than broken out.

Can you install in winter or wet weather?

Yes. Ground screws are designed for installation all year round and there is no concrete to protect while it cures, so weather that would stop a dig and pour does not stop us.

Which areas do you cover?

We install across Liverpool, Merseyside, Sefton, Wirral, Knowsley, St Helens, Warrington, Cheshire and the wider North West, and we supply ground screws nationally as one of the UK's biggest independent distributors.

Free quote

Site setup to programme?

Send the hoarding run length, panel height and site address. We will price the foundation and fit it around your setup dates.

  • Development, supply and installation under one roof
  • One of the UK's biggest independent ground screw distributors
  • Screws made from 70% recycled galvanised steel
  • Around 70% faster and cheaper than digging
  • No excavation, no concrete, no spoil to remove
Call 0151 530 1825

No obligation. We'll ask a few questions about the project and give you an estimate over the phone. Prefer to talk now? Call 0151 530 1825.

Call NowFree Quote